737 Leg 8 Denali - Day 193

Left at 1.50am to climb 7 hours with full loads, no cache. Arrived at 11,000ft camp at 8.50am. It’s at 10,990ft – they work in feet over here rather than metres.

Conditions much better today, much colder making the route more stable. Although we did have to cross a few monster crevasses early in the day. Today was physically tough climbing over 1000m with full loads but the better conditions were a much needed boost to our spirits after our epic first day!

We’ve spent the last 3 hours building snow walls, melting snow so we are bombproof for the bad weather forecasted tomorrow. In my bag so tired, we’re off 2 sleep.

FACT: Cache is load depositing at a camp in order to split carrying all your gear at once.